IT asset retirement in Jurong East & Tuas — same-day pickups available.
The Jurong / Tuas corridor is Singapore's heaviest data-centre concentration — Tuas DC quarter, Jurong industrial estate. Multi-rack and floor-suite decommissioning runs are routine in this area.
Asset classes we routinely uplift in Jurong East & Tuas
- ♦ Major data-centre operator decom — Equinix SG cluster, ST Telemedia, Digital Realty, NTT, Iron Mountain.
- ♦ Industrial-estate manufacturing IT.
- ♦ Tuas-side container-class re-export to ASEAN.
- ♦ Bulk pickup runs — pallet-class to truck-class loads.
Singapore's heaviest data-centre concentration.
The Jurong / Tuas / Pioneer corridor holds Singapore's largest data-centre concentration — Tuas DC quarter (multiple hyperscale and large colocation builds), Jurong industrial estate (older established colocation), Pioneer / Joo Koon (industrial-IT-mix). Major operator sites in the corridor include facilities operated by Equinix (SG3, SG4, SG5 cluster), ST Telemedia Global Data Centres, Digital Realty, NTT GDC, Iron Mountain, Telin, Singtel-operated DCs, and Yondr-class hyperscale builds.
Multi-rack and floor-suite decommissioning runs are routine in this corridor. Common scopes: tenant-side decommissioning (the most common pattern — our customer is the tenant, the operator is informed and coordinated with); operator-side pull-and-replace work where the operator owns the kit; container-class re-export logistics at the Tuas-side facilities adjacent to the port. Pickup runs typically use 4-tonne or larger trucks given the scope; multi-day pickup windows for whole-cage exits.
From our Goldhill Plaza HQ to the Tuas DC quarter is 35–50 minutes via PIE / AYE depending on time of day. For multi-day decom we run staging from the customer cage with daily hand-back of empty rack space.
Visual reference.
ITAD in Jurong & the Tuas DC corridor — frequently asked
Can you handle multi-day decoms in the Tuas DC corridor?
Yes. Multi-day pickups, multi-truck loads, and multi-cage decommissions are routine in this corridor.
Can you handle whole-cage data-centre exits in the Tuas DC quarter?
Yes. The Jurong / Tuas / Pioneer corridor is Singapore's densest data-centre concentration — Equinix SG3/SG4/SG5, ST Telemedia, Digital Realty, NTT GDC, Iron Mountain, Telin, Singtel-operated facilities. Multi-rack and floor-suite decommissioning is routine; multi-day pickup windows for whole-cage exits supported. From Goldhill Plaza HQ to the Tuas DC quarter is 35–50 minutes via PIE/AYE depending on time of day. Container-class re-export logistics at the Tuas-side facilities adjacent to the port.
Can Maxicom decommission whole cages in the Tuas DC quarter?
Yes. The Jurong / Tuas / Pioneer corridor is Singapore's densest data-centre concentration. Major operator sites in the corridor include Equinix SG3, SG4, SG5; ST Telemedia; Digital Realty / Digital Singapore; NTT GDC; Iron Mountain; Telin; Singtel-operated DCs; Yondr-class hyperscale builds. Multi-rack and floor-suite decommissioning runs are routine; multi-day pickup windows for whole-cage exits supported. From Goldhill Plaza HQ to Tuas DC quarter is 35-50 minutes via PIE/AYE depending on time of day.