📞 +65 9747 6071 ✉ purchase@maxicom.sg
Free 2-Hour Quote — Singapore
NIST 800-88 IEEE 2883-2022 PDPA-Aligned Data Destruction Per-Job Certificate of Destruction SGD Settlement 2-Hour Quote SLA
Solutions · Branch Closure

Branch closure IT retirement across Singapore.

Bank branches close; SG-presence MNCs consolidate offices; retail-and-banking footprint shrinks. Each closure leaves a trail of IT — workstations, branch-server kit, networking, AV, queue-management terminals, ATM-adjacent IT. We coordinate multi-branch consolidated pickup with a single audit pack covering the whole closure programme.

No obligation · written SGD response within 2 working hours
Common branch IT we retire

What's typically in scope at a closing branch

  • Customer-facing workstations — teller, queue-management, advisor terminals.
  • Back-office workstations — ops staff, branch-management endpoints.
  • Branch server-room kit — local file server, backup appliance, edge networking.
  • Networking — branch firewall, switches, WiFi APs, telephony gateway.
  • AV / signage — board-room TVs, queue-management displays, ATM-adjacent kiosks.
  • Printers, scanners, MFPs holding scan-history data.
  • Disposable assets — branded merchandise, signage (returned to brand or destroyed).
Why consolidated multi-branch matters

One project across all closing branches, not one-off per branch.

Closures often run across 10-50 branches over 6-18 months. Treating each as a one-off ITAD engagement multiplies onboarding overhead and audit-pack complexity. Consolidated execution is structurally better.

  • Single SoW · One Statement of Work covering all branches in the closure programme.
  • Single audit pack · One consolidated disposition report at programme end, plus per-branch sub-reports.
  • Phased pickup · Branch-by-branch as each closes, on the closure-team's schedule.
  • Volume-tier pricing · Better SGD residual + better destruction-cost economics vs single-branch quotes.
  • Unified PM · One project manager across the whole programme.
FAQs · 2 questions

Maxicom Singapore — frequently asked

Can you handle a 50-branch closure programme?

Yes. Multi-branch consolidated retirement at 10-50 branches is in our standard scope. Phased pickup over 6-18 months; one SoW; consolidated audit pack at programme end. References available on request.

Same-day uplift on the day a branch closes?

Yes — coordinated with the closure team's facilities schedule. Vehicles dispatched to coincide with the closure's final-day handover.

Last reviewed · Maxicom Singapore Editorial & Compliance Team · Suggest a correction

Still reading?

Get an SGD-denominated quote within 2 working hours.

Send an asset list to purchase@maxicom.sg or call +65 9747 6071. No obligation; per-line residuals; PDPA-aligned destruction included.

Get started — it takes 2 minutes

Get a written SGD quote within 2 hours.

No obligation. PDPA-aligned destruction documentation, NIST 800-88 + IEEE 2883-2022 standards, per-job Certificate of Destruction, settlement on uplift. Three ways to reach us.

1 Send asset list. CSV / spreadsheet with serials, makes, models.
2 Get SGD quote within 2 working hours, per-line residuals.
3 Locked uplift + NIST 800-88 destruction + SGD settlement.
📞 +65 9747 6071 · Mon-Fri 08:30-18:00 SGT · 📧 purchase@maxicom.sg · 📍 51 Goldhill Plaza #07-10/11, Singapore 308900